![]() ![]() The airbridge and regular resupply ship are successfully maintaining freight to both Ascension Island and the Falkland Islands. We are working collaboratively with the US to deliver this. “The Airbridge will continue to route through Cape Verde until the runway is refurbished. In a statement to the UK Defence Journal, the Ministry of Defence confirmed: Flightradar24 is the world’s most popular flight tracker. See route maps and schedules for flights to and from Ascension Island and airport reviews. Whilst the runway closure is an issue for the passenger airbridge and the Ascension Island Government, it appears not to be an issue for the security of the Falkland Islands. Ascension Island Airport, (ASI/FHAW), Saint Helena - View live flight arrival and departure information, live flight delays and cancelations, and current weather conditions at the airport. Transport aircraft can still operate from Ascension Island, including C-130, A400M, and C-17. While it is likely they’d be part of a reinforcement plan, heavier equipment would be carried by either C17 or A400M Atlas.Īny suggestion that plans to reinforce the Falkland Islands would be hindered by the runway closure have been dismissed. Voyager aircraft currently serve the twice a week airbridge flight from RAF Brize Norton to the Falklands via Cape Verde. Now it is used by the and the Yesterday a delivered supplies, mail and personnel in an #A400M /0OhoEs3ycR One of our British Overseas Territories, Ascension Island was used extensively during the Falklands conflict. ![]() The repair work was originally scheduled to be complete by 2020. ![]() The runway itself is owned by the US Department of Defense, although the Royal Air Force maintain a base on the airfield. It is anticipated that the repair work could take up to 24 months. To use the RAF service you will need to contact the Falkland Islands Government Office Travel Co-ordinator by calling 0207 2222 542 or by emailing travelfalklands. “The US Air Force Civil Engineering Centre are expecting tender returns in August 2019 from which the contract will be awarded in the final quarter of 2019” The accommodation on Ascension Island is poor, but the island is on the equator and very interesting to sight-see. In a Parliamentary answer last week, Defence Minister Mark Lancaster confirmed: In May 2018 Defence Minister Mark Lancaster said “The Ascension Island airfield is critical to our ability to support the Falkland Islands.” It is understood that the runway is “critical” to existing plans to reinforce the Falkland Islands if a threat was identified. It has been partially closed since April 2017. The contract to repair the 3,000 metre runway at RAF Ascension Island has yet to be awarded, and work may not be complete until 2022. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |